A diagram shows a slope with layers of riprap, hydraulic infill, and turf reinforcement mat, detailing anchor placement and dimensions for erosion control using the GreenArmor System.

A conceptual trap channel configuration using the GreenArmor System combines FUTERRA® 7003/7010/7020/R45 HP-TRM with FLEXTERRA HP-FGM® hydraulic infill and a riprap section. The detail shows typical channel dimensions, placement of the HP-TRM and hydraulic infill, and use of 10–12 in. (25–30 cm), 8 gauge minimum staples or anchors, with optional percussive driven or #3 rebar anchors for submerged applications. It also indicates riprap or granular fill thickness and anchor density for shoreline conditions. All information is general and conceptual only and requires independent professional examination and verification before use on a specific application.

Key Points

  • Combines FUTERRA 7003/7010/7020/R45 HP-TRM with FLEXTERRA HP-FGM hydraulic infill in a trap channel with riprap.
  • Indicates 10–12 in. (25–30 cm), 8 gauge minimum staples/anchors, with optional percussive driven or #3 rebar anchors for submerged applications.
  • Recommends 2.5 anchors/yd² (3 anchors/m²) for shoreline applications.
  • Shows 6 in. (15 cm) riprap thickness with appropriate riprap or granular fill and emphasizes that the information is for conceptual use only and not intended for construction without independent verification.