Case Study

Environmental

Download

Memorial Park Land Bridge and Prairie

A wide road tunnel with arched entrances, covered by green artificial turf and lined with safety railings. Construction vehicles and workers are visible near and atop the tunnel. Orange cones block part of the entrance.

Memorial Park Land Bridge and Prairie reconnects Houston’s urban landscape with a restored coastal prairie, addressing steep banks, poor soil quality and stormwater challenges. Using Profile Products’ Soil Solutions Software (PS3), the team identified depleted soils and validated ProGanics® Biotic Soil Media through a test plot before full-scale hydraulic application. Integrated with the GreenArmor® System—Futerra® R45 HP-TRM and Flexterra® HP-FGM®—the solution stabilized slopes, controlled erosion and improved stormwater management. More than 90 native species now vegetate the land bridge and surrounding prairie, creating a critical corridor that supports pollinators, birds and other wildlife.

Key Points

  • Memorial Park faced steep banks, poor soil quality and an ecologically battered coastal prairie that required restoration and improved stormwater management.
  • PS3 testing showed low organic matter of 0.6% plus poor cation exchange capacity and solvita respiration, leading the team to select ProGanics® Biotic Soil Media over other wood compost products.
  • The GreenArmor® System combines ProGanics®, Futerra® R45 HP-TRM and Flexterra® HP-FGM® to secure seed and soil on steep banks, establish vegetation and enhance stormwater management.
  • Soil tests showed a 116% increase in organic matter, 148% increase in cation exchange capacity, 423% increase in respiration, and notable rises in bacterial and fungal populations, supporting lush vegetation and long-term habitat restoration across more than 75 acres of coastal prairie.
Aerial view of a suburban neighborhood with houses, winding roads, a green park, and mountains in the background under a clear sky.

Want to learn about solutions for your environment?