Blog
Stay up to date with the latest news and information from Profile
Case Study
Kaikoura Earthquake Project Brief
Following the 7.8 magnitude Kaikoura earthquake in November 2016, New Zealand’s North Canterbury Transport Infrastructure Recovery (NCTIR) team worked with...
View
Fire Reclamation: Thomas Fire Montecito, California
After California’s 2018 Thomas fire, a two-acre Montecito property with rocky 1H:1V and 2H:1V slopes needed erosion control and vegetation...
Peak Downs Coal Mine Case Study
At the Peak Downs mine in Queensland, Australia, the site owner needed a cost-effective way to revegetate five hectares of...
Nebraska Department of Transportation Case Study
The Nebraska Department of Transportation needed to quickly revegetate approximately 25 miles of widened highway shoulders in the arid Nebraska...
Central America Case Study
During construction of a new copper mine in Central America, fragmented rock waste along a 35.4 km access road created...
Southeastern U.S. Mine Reclamation Case Study
An abandoned mine in the Southeastern U.S. struggled with barren areas and repeated seeding failures across 5 acres due to...
Norway House Case Study
In remote Norway House, Manitoba, the community needed to quickly turn two bare baseball fields—only one with irrigation—into playable turf....
Florida Lawn Renovation Case Study
This contractor wanted to encourage growth on thin spots of established lawns using a jet agitated hydroseeder, but wasn’t sure...
Residential Development Case Study
Many residential developments rely on sod for quick lawns, but it can be expensive and may lead to poor root...
Memorial Park Land Bridge and Prairie
Memorial Park Land Bridge and Prairie reconnects Houston’s urban landscape with a restored coastal prairie, addressing steep banks, poor soil...
Griffith Park Case Study
Profile Products Helps Prevent Mudslides From Threatening California Community After fire ravages park, officials must quickly protect burned slopes to...
West Orange Solar Farm Case Study
In historic Orange, Massachusetts, Standard Solar committed to maintaining vegetative grass coverage on 80 percent of a 77-acre solar farm...
Want to learn more about erosion control?